Project Manager: Matthew Ablett

The client wanted this office fitout to be a creative hub for the new Children’s Hospital Project Office. Following specific designs, a curved powdercoated steel reception desk was installed under a flush set ceiling with feature lighting in front of signage constructed from Duplo. S-shaped tables break up the space overlooking the street below. Three meeting rooms were fitted with audio visual equipment and roller blinds and two levels of work areas were fitted with new ceiling to hide extensive mechanical works. The end result proved to be an inspired space that demonstrates a professional yet artistic exuberance.