Project Director: Ben Scott
Construction Manager: JP Kennedy
Project Manager: Jim Bryden
Site Foreman: Ben Morris

280 Adelaide street is the Brisbane headquarters for WorkCover. With the client in occupation, the new fitout looked to maximise internal efficiencies and streamline service delivery. New Level 10 -15 Fitout works required excellent site, safety and program control to ensure continuous disruption minimisation, timely handover, and high quality work completion. These were undertaken in conjunction with upgrade works to 8 other levels. Base build upgrade works were also coordinated to include client nominated trades for Mechanical and Electrical, and excellent program and site control were required to manage the multiple site trades. Open and transparent communication formed a pivotal role in ensuring an informed and included Client, variation minimisation and project cost control. Stage one works were delivered with efficient work methodology, timeliness and a strong Client focus. Subsequent stage 2 works were also awarded to Quadric.

With WorkCover as our Client, providing excellent site safety across all shared access and shared spaces, was a critical project deliverable. Well managed, strategic planning and careful staging of works were required to deliver disruption minimisation across the whole of the tenanted and occupied building.  As the Principal Contractor, Quadric facilitated this process in collaboration with the client.