Works in Progress Q2 2020

Current Projects in Q2 2020:

Corporate

  • NTI Workplace – 300 George
  • DVA Office Hobart
  • Level 2 & 5 at 50 Ann St

Education

  • Cooler Schools Program – Ipswich
  • Cooler Schools Program – Moreton
  • Marsden SHS – Hall Refurbishment
  • Carole Park SS – Block C Roof Replacement
  • Sunnybank SHS SIE Science Refurb
  • TAFE Southport & Ashmore
  • TAFE Mt Gravatt
  • Griffith Uni – L3 & 6 Studios Southbank

Hospitality & Public Space

  • Queensland Museum – Fire Suppression Installation
  • Beachmere Community Centre Refurbishment
  • Gabba Stadium Concession Redevelopment

Aviation & Security

  • Brisbane Airport Body Scanner Enabling Works
  • Puppy Training School
  • Smartgate Kiosk Replacement ITB Brisbane
  • Transition Gate Upgrades DTB Brisbane

Health

  • QUT GP Q Block Electrical Infrastructure Upgrade
  • Co-Health Labs – Gold Coast Health & Knowledge Precinct

Base Building Upgrade

  • End of Trip Facility 76 Skyring Tce
  • End of Trip Facility 33 Park Rd
  • End of Trip Facility 199 Grey St
  • QRail Depot Workshop Qantas Drive

Optima Partitions

  • Vanguard 10,000m2 Fitout Melbourne
  • Minter Ellison 11,000m2 Fitout Melbourne
  • ANZ Open House 3,400m2 Melbourne
  • NAB Wynyard Place 2,500m2 Sydney
  • CBA ATP Building Sydney 10,000m2 Sydney
  • Barker College Sports & Learning Precinct 3,900m2 Sydney
  • Herston Biofabrication Institute 2,000m2 Brisbane
  • Knox Grammars School Wellbeing Centre 100m2 Sydney
  • Scotch College Lithgow Refurb 1,000m2 Melbourne
  • Macquarie Uni Lincoln Building 2,300m2 Sydney
  • Lakeside Discovery Centre 2,500m2 Melbourne
  • NAB 405 Bourke St 1,250m2 Melbourne
  • Future Fund 5,500m2 Melbourne
  • ANU Research School 17,500m2 Canberra
  • Rio Tinto Brisbane 10,000m2 Brisbane

Spoke Joinery

  • BHP Office Mackay
  • QSuper
  • Coopers Plains SS
  • Kingston SC
  • St Ives High School
  • Qrail Yerongpilly
  • CYB Lab Office Refurb
  • Fisher & Paykel Display Centre
  • 281 Bilsen Rd Shed
  • Monaro High School
  • QRail Fairfield Depot

Works in Progress Q4 2019

Current Projects in Q4 2019:

Corporate

  • Co-Hort Expansion – Parklands
  • NDIA – Robina, Mackay, Townsville
  • SEQ Water Brisbane
  • SEQ Water Ipswich
  • K & L Gates Fitout CP2
  • Workcover HQ Refurbishment

Education

  • Cool Schools Program – Forest Lake State School
  • Griffith University – Design Studios Southbank
  • Red Hill SS – Junior Learning Centre
  • Marsden SHS – Hall Refurbishment
  • Carole Park SHS  – Block C Roof Replacement
  • Sunnybank SHS – Science Refurbishment
  • Wavell SHS – SIE Classroom Fitout
  • Jindalee SS – Painting Upgrade
  • UQ – McElwain Boardroom

Hospitality & Public Space

  • Mei Wei Restaurant Fitout – Treasury Casino
  • Livewire Bar Refurbishment – Treasury Casino
  • Cashier Corridor Works – Treasury Casino
  • Queensland Museum – Fire Suppression Installation
  • Beachmere Community Centre Refurbishment
  • Gabba Stadium Concession Redevelopment

Aviation & Security

  • Brisbane Airport Body Scanner Enabling Works
  • Queensland Police HQ Level 7 Refurbishment
  • Qantas Ramp Refresh – Brisbane Domestic Terminal
  • Bundaberg Courthouse Redevelopment
  • QCAT Office Refurbishment – 259 Queen St

Health

  • QUT Q5 Biotechnology Laboratory
  • Bundaberg Hospital Pathology
  • Co-Health Labs – Gold Coast Health & Knowledge Precinct

Base Building Upgrade

  • 66 Bowen Street Building Upgrade
  • 66 Eagle St, Level 16 Amenities
  • Mirvac – 340 Adelaide St Forecourt & Foyer Refurbishment

Optima Partitions

  • QGC Shell 10,000m2 Brisbane
  • UQ Buildings 67 & 69 7,500m2 Brisbane
  • Gadens Lawyers 10,000m2 Melbourne
  • Vanguard 10,000m2 Fitout Melbourne
  • Minter Ellison 11,000m2 Fitout Melbourne
  • ANZ Open House 3,400m2 Melbourne
  • NAB Wynyard Place 2,500m2 Sydney
  • CBA ATP Building Sydney 10,000m2 Sydney
  • Barker College Sports & Learning Precinct 3,900m2 Sydney
  • Herston Biofabrication Institute 2,000m2 Brisbane
  • Knox Grammars School Wellbeing Centre 100m2 Sydney
  • Scotch College Lithgow Refurb 1,000m2 Melbourne
  • Macquarie Uni Lincoln Building 2,300m2 Sydney
  • Lakeside Discovery Centre 2,500m2 Melbourne

Spoke Joinery

  • CYB Staff Kitchen Refurb
  • CYB Lab Office Refurb
  • Mt Maria College Stage 8
  • Sunshine Depot Temporary Offices
  • BASQT
  • 1 Newstead Terrace
  • RAAF Amberley Working Dogs
  • QRail Yeerongpilly Depot
  • Oasis Medical Centre
  • FKG Newstead
  • Mango Hill State School
  • Sunnybank SHS
  • Brisbane Spine Clinic
  • Mt Tamborine SHS

Projects Stats Q3 2019

Current Projects in Q3 2019:

Corporate

  • SEQ Water Brisbane
  • SEQ Water Ipswich
  • K & L Gates Fitout CP2
  • TUH Offices Brisbane
  • Qrail Workplace – 30 Makerston St, Brisbane
  • Workcover HQ Refurbishment

Education

  • Goodstart Early Learning Centres Regional Rollout
  • Kool Kids Ashmore

Hospitality / Retail

  • Star Entertainment – Level 3 / 159 William St
  • Gabba Stadium Concession Redevelopment

Aviation & Security

  • My Lounge Fitout – Brisbane ITB
  • High Security Fitout – Newcastle
  • Downer Defence Fusion & Security Centre
  • Queensland Police HQ Level 7 Refurbishment
  • Qantas Ramp Refresh – Brisbane Domestic Terminal
  • Bundaberg Courthouse Redevelopment
  • QCAT Office Refurbishment – 259 Queen St

Health

  • Bundaberg Hospital Pathology
  • UQ Centre for Excellence – PA Hospital
  • Co-Health Labs – Gold Coast Health & Knowledge Precinct

Base Building Upgrade

  • 66 Eagle St, Level 16 Amenities
  • Mirvac – 340 Adelaide St Forecourt & Foyer Refurbishment
  • Parliamentary Annex Lift Extension

Optima Partitions

  • QGC Shell 10,000m2 Brisbane
  • UQ Buildings 67 & 69 7,500m2 Brisbane
  • Gadens Lawyers 10,000m2 Melbourne
  • Vanguard 10,000m2 Fitout Melbourne
  • Investa 1,500m2 Fitout Sydney
  • UNSW K15 1,000m2 Fitout Sydney
  • Minter Ellison 11,000m2 Fitout Melbourne
  • ANZ Open House 3,400m2 Melbourne
  • NAB Wynyard Place 2,500m2 Sydney

Spoke Joinery

  • RAAF Amberley Working Docs
  • QRail Yeerongpilly Depot
  • Oasis Medical Centre
  • FKG Newstead
  • Mango Hill State School
  • Sunnybank SHS
  • Brisbane Spine Clinic
  • Mt Tamborine SHS

Project Stats Q2 2019

Chart

Current Projects in Q2 2019:

Corporate

  • K & L Gates Fitout CP2
  • QSuper Regional Office Rollout
  • QSuper Upgrades – Central Plaza 3
  • ARUP Workplace Maroochydore
  • Logan City Council – DA Pilot Space
  • TUH Offices Brisbane
  • Queensland Racing Science Centre
  • CFMG Capital Workplace
  • Co-Hort Space – Gold Coast Health & Knowledge Precinct
  • Qrail Workplace – 30 Makerston St, Brisbane
  • Sunwater Meeting Rooms Acoustic Upgrade
  • Workcover HQ Refurbishment
  • CBRE Office expansion

Education

  • Goodstart Early Learning Centres Regional Rollout
  • Watson Road State School Upgrades
  • Runway Bay Sports Centre
  • Coorparoo State School Art Classroom

Multi-Residential

  • Welsh Residence Refurbishment, Sunshine Coast
  • Sheraton Hotel Lobby Upgrades, Gold Coast

Hospitality / Retail

  • Treasury Casino – Orchid Room Refurbishment
  • Star Entertainment – Level 4 / 159 William St
  • Star Entertainment – Level 3 / 159 William St
  • Suncorp Stadium – Concession Redevelopment
  • QCAT Office Refurbishment – 259 Queen St
  • Gabba Stadium Concession Redevelopment
  • Anytime Physio – Gasworks
  • Queensland Theatre Company Works

Aviation & Security

  • My Lounge Fitout – Brisbane ITB
  • High Security Fitout – Newcastle
  • Home Affairs – 299 Adelaide St Brisbane
  • Home Affairs – Sunshine Coast
  • Downer Defence Fusion & Security Centre
  • Holland Park Courthouse Refurbishment
  • Queensland Police HQ Level 7 Refurbishment
  • Qantas Ramp Refresh – Brisbane Domestic Terminal
  • Bundaberg Courthouse Redevelopment

Health

  • Greenslopes Colorectal Fitout
  • Bundaberg Hospital Pathology
  • UQ Centre for Excellence – PA Hospital

Base Building Upgrade

  • Investa Property Group – 179 Turbot St Stormwater Repairs
  • Investa Property Group – 259 Queen St Lobby & Amenities
  • Mirvac – 340 Adelaide St Forecourt & Foyer Refurbishment
  • Parliamentary Annex Lift Extension
  • Rmax – Soil Remediation Coopers Plains

Optima Partitions

  • QGC Shell 10,000m2 Brisbane
  • UQ Buildings 67 & 69 7,500m2 Brisbane
  • Gadens Lawyers 10,000m2 Melbourne
  • Australian Unity 12,000m2 HQ Melbourne
  • Mill Film 4,000m2 Workplace Melbourne
  • Vanguard 10,000m2 Fitout Melbourne
  • UQ Priestly Building 1,500m2 Brisbane

Spoke Joinery

  • Beenleigh State School
  • Meridian State College
  • Defence – Growler Phase 2
  • Forest Lake State High School
  • Steelforce Warehouse & Office
  • Macgregor State High School
  • Degroots River Quarter
  • Defence – Land 17 Phase 1B/1c Sydney
  • Defence – Land 17 Phase 1B/1c Newcastle

Subtrade EOI – QGC Shell Project 275

EXPRESSION OF INTEREST. Shell QGC Project 275 (Brisbane Office Accommodation)

shell-2

Quadric Pty Ltd has been shortlisted to tender for the Principal Contract of the QGC Shell Fitout Project in 275 George St, Brisbane, and is seeking Expressions of Interest from appropriately qualified and experienced trade contractors to participate in the subtrade tender.

The purpose of this Expression of Interest is to inform the market of the impending release of the tender planned for the 18th of December 2018 with subtrade tenders closing on the 5th of February 2019. Commencement on site planned for mid-March 2019 with completion 30th of November 2019.

The works are circa 10,000m2 over 7 levels including reception, meeting rooms, 600 workpoints and associated areas and facilities, specialised collaborative working environment areas with high end AV / IT requirements, and upgrades to lift lobbies and amenities.

A primary outcome for the project will be to deliver ‘Goal Zero’ with regard to Shell QGC’s HSSE ethos and Quadric’s ‘Beyond HSEQ’ best practice mission. Local south-east Queensland industry participants will be looked upon as favourable, as will majority-owned Indigenous entities.

Subtrades required include (but not limited to):

  • Services: Electrical, Data, AV, Security, Mechanical, Hydraulics, Fire Services
  • Finishes: Painting, Floor Preparation, Tiling, Waterproofing, Film, Carpets & Vinyl, Access Floor, Window Coverings.
  • Building: Demolition, Ceilings & Partitions, Glazing, Structural Steel, Stainless Steel
  • FFE: Commercial Joinery, Toilet Partitions, Wall Panelling, Appliances, Door & Sanitary Hardware, Operable Walls, Signage, Workstations, Loose Furniture

Subtrades are to submit to project275@quadric.com.au by 7th December 2018 including a cover letter detailing their reasons for proposed inclusion in the subtrade tender along with their company profile. Companies who have been awarded a place on the subtrade tender will be notified by email by the 14th of December 2018 followed by the invitation to tender via estimateone on or about the 18th of December 2018.

QBCC 17647

Project Stats 2018 Q4

charts2

Current Projects in Q4 2018:

Corporate

  • QSuper Regional Office Rollout
  • 53 Albert St, Level 18
  • ARUP Workplace Brisbane
  • Sunwater Workplace Brisbane
  • Diona Engineers Fitout Brisbane
  • TUH Offices Brisbane
  • AEC – Queensland State Office

Education

  • Goodstart Early Learning Centres Regional Rollout
  • QUT – E Sports
  • Coorparoo State School Art Classroom
  • Springfield Central State School Shade Structures
  • Sunnybank State High School Classroom Refurbishment

Multi-Residential

  • Parklands Redevelopment Lots A & B
  • Welsh Residence Refurbishment

Hospitality / Retail

  • Anzac Legacy Gallery Exhibition – Queensland Museum
  • Treasury Casino – Orchid Room Refurbishment
  • Treasury Casino – Fat Noodle Restaurant
  • Treasury Casino – Level 1 Gaming Floor
  • Treasury Casino – Sovereign Bar
  • Treasury Casino – Diamond Members Carpark
  • NDIA Mt Gravatt
  • Gabba Stadium Concession Redevelopment

Aviation & Security

  • BAC Accessibility Bathrooms – Brisbane ITB
  • BAC HQ – Level 2 East Wing
  • My Lounge Fitout – Brisbane ITB
  • DJAG – Court Dock Upgrade Stage 3
  • High Security Fitout – Newstead
  • Secure Room – Springfield
  • Magistrates Court – Coolangatta

Health

  • Ipswich Orthopaedic Fitout
  • PA Hospital Surgical Bathroom Refurbishment
  • RBH Hospital Works

Base Building Upgrade

  • ZUPP Property Group – 26 Brandl St Redevelopment
  • Investa Property Group – 239 George St Makegood
  • Investa Property Group – 179 Turbot St End of Trip Facility
  • Level 3, 342 Wickham St Makegood
  • ATO, 55 Elizabeth St, Hydraulics Upgrade
  • Rail Centre 2 – Level 1 Works
  • 140 Creek St – Stormwater Repairs

Optima Partitions

  • QUT Education Building Kelvin Grove, Brisbane
  • White and Case Additional Works, Melbourne
  • Uni of Melbourne – WEBS Project
  • Australian Unity HQ Melbourne
  • IAG Darling Park
  • Jones Day Office, Rialto Tower Melbourne
  • Maddocks Office, Canberra
  • Australia Pacific Airports – Terminal 4 Melbourne
  • Adelaide Day Surgery

Spoke Joinery

  • Export St, Project
  • Queensland Police
  • Qantas ITB Joinery
  • SAS Lab Darra
  • Level 18 / 30 Mary St
  • Hanson Concrete
  • Coorparoo State School

Revealing Mephisto

Quadric is excited to reveal Mephisto to the public when the Anzac Legacy Gallery opens; a new permanent exhibition at Queensland Museum that explores the impact and legacy of the First World War on Queensland and the brave sacrifices made by our diggers.

mephisto

“A book on the daring capture of a German WWI tank by Australian soldiers in France has been released to coincide with the 100th anniversary of one of the conflict’s most legendary exploits.

Ranking among Australia’s most precious trophies from the Great War, the German A7V Sturmpanzer still affectionately known by its battlefield name Mephisto, was seized from no man’s land under the nose of the enemy.

It is set to go on permanent display at the Queensland Museum in November to coincide with the centenary of the Armistice.

“It’s unique, it’s the only one of it’s kind in the world, but it also speaks to the war and the people who were involved in the war,” said Geraldine Mate, Queensland Museum’s curator.

“I don’t think you can put a value on it. It’s a pivotal moment for the gallery because Mephisto has spent 98 of its 100 years in Queensland.”

See more at:  https://www.sbs.com.au/news/only-remaining-german-wwi-tank-marks-100-years-in-australian-hands

Project Stats Q3 2018

Q3 2018

Current Projects in Q3 2018:

Corporate

  • Bechtel Workplace Brisbane
  • ARUP Workplace Brisbane
  • Sunwater Workplace Brisbane

Education

  • QUT – E Sports
  • Coorparoo State School Art Classroom
  • Runaway Bay Sports Centre Roof Replacement
  • Wavell State High School Home Economics Facility
  • Marshall Road State School Administration Block
  • Springfield Central State School Shade Structures
  • Sunnybank State High School Classroom Refurbishment

Multi-Residential

  • Commonwealth Games Athlete’s Village Refurbishment

Hospitality / Retail

  • Anzac Legacy Gallery Exhibition – Queensland Museum
  • Treasury Casino – Level 2  upgrades
  • Treasury Casino – Loading Dock
  • Suncorp Stadium Members Bar
  • NDIA Mt Gravatt

Aviation & Security

  • Brisbane Airport ITB ‘Changing Places’ Project
  • Homes Affairs Office 299 Adelaide St, Brisbane
  • Homes Affairs Office 21 Lindsay St, Darwin
  • Qantas Lounge Alterations

Health

  • AQIS Laboratory Refurbishment – Forensics & Scientific Services Campus
  • Bluecare Health Hub Morayfield
  • Queensland Tissue Bank Centre
  • Eco-Sciences Precinct Refurbishment
  • Air-conditioning Plant upgrade at 26 Kessels Rd
  • Healthscope Pharmacy – Toowoomba
  • PA Hospital Surgical Bathroom Refurbishment

Base Building Upgrade

  • ZUPP Property Group – 26 Brandl St Redevelopment
  • Investa Property Group – 239 George St Makegood
  • Investa Property Group – 179 Turbot St End of Trip Facility
  • Daisho – 192 Ann St Makegood
  • Daisho – 180 Ann St Upgrade
  • Kenmore Village Roof Replacement
  • Mirvac – 410 Ann St Roof Repairs

Optima Partitions

  • Rio Tinto Workplace, Perth
  • QUT Education Building Kelvin Grove, Brisbane
  • Uni of Melbourne Bio21, Melbourne
  • White and Case Additional Works, Melbourne
  • Uni of Melbourne – WEBS Project
  • Juniper Melbourne Expansion
  • Australian Unity HQ Melbourne

Spoke Joinery

  • Export Drive Development
  • Hanson Brisbane
  • Legal Aid Office
  • Education House Level 18
  • Department of Defence
  • Qantas Lounge
  • Qantas T3 BCP Modules
  • Meadowbrook Childcare
  • William Hall Chadwick
  • Uber
  • Growler Facility, Amberley Air Base
  • Skygate Tenancy

Project Stats Q2 2018

Capacity Q2 2018

Current Projects in Q2 2018:

Corporate

  • IA Design Studio
  • BTC Management Office
  • Bechtel Workplace Brisbane
  • Office of Commonwealth Ombudsman
  • Legal Aid Office

Education

  • Springfield Anglican College TASC Year 1
  • Runcorn State High School GLA Classrooms Refurbishment
  • Ferny Grove State High School Manual Arts Refurbishment
  • Woodridge State High School Block G Classroom Construction

Hospitality / Retail

  • Brisbane Convention & Exhibition Centre Plaza Ballroom Entry Upgrades
  • Treasury Casino Black Hide Restaurant
  • Treasury Casino External Awning
  • Treasury Casino Livewire Corridor
  • Treasury Casino Stairway
  • Treasury Casino Loading Dock Refurb
  • DHS Maryborough

Aviation & Security

  • Brisbane Airport Construction Management of New International VIP Lounge and Bathroom Upgrade
  • DIBP Regional Command Centre
  • Data Centre – Star Group

Health

  • AQIS Laboratory Refurbishment – Forensics & Scientific Services Campus
  • Bluecare Health Hub Morayfield
  • Queensland Tissue Bank Centre

Base Building Upgrade

  • Level 15 / 15 Adelaide St
  • 232 Adelaide Street Rooftop
  • State Law Building Level 7
  • State Law Building Levels 20 & 23

Optima Partitions

  • Rio Tinto Workplace, Perth
  • Origin Energy Workplace, Brisbane
  • QUT Education Building Kelvin Grove, Brisbane
  • Uni of Melbourne Bio21, Melbourne
  • Crime & Corruption Commission, Perth
  • White and Case Additional Works, Melbourne
  • Western Sydney Uni –  J Block
  • Uni of Technology Sydney – Protospace
  • IAG Workspace Darling Park, Sydney
  • Sancta Sophia College, Sydney
  • Uni of Melbourne – SPOT Building FBE Teaching, Melbourne
  • Uni of Melbourne – WEBS Project

Spoke Joinery

  • Uber Brisbane
  • DHS Smart Centre
  • Ignite Brisbane
  • Abian Tower Residences
  • Wellspring
  • Williams Hall Chadwick
  • Meadowbrook Childcare Centre
  • Griffith Uni G14 Laser Print
  • DHS Bundaberg
  • Mt Tamborine SHS
  • Qantas Desks Domestic Terminal
  • Target Brookside
  • Kerry Australia
  • Clermont School
  • Qantas T3 BCP Modules

Project Stats Q4 2017

Untitled-5

Current Projects in Q4 2017:

Corporate

  • Link Group Office – 10 Eagle St
  • TUH Health
  • DETE Offices Mt Gravatt
  • Rio Tinto Client Level 123 Albert St
  • Department of Science, Information Technology and Innovation L5, 7, 12 / 140 Creek St

Education

  • Springfield Anglican College TASC Year 1
  • Runcorn State High School GLA Classrooms Refurbishment
  • Ferny Grove State High School Manual Arts Refurbishment
  • Woodridge State High School Block G Classroom Construction
  • Watson Rd State School Administration Building
  • Wavell Stage High School Home Economics Refurbishment
  • Kelvin Grove Manual Arts Refurbishment
  • Corinda Outdoor Learning
  • Stretton Outdoor Learning

Hospitality / Retail

  • Brisbane Convention & Exhibition Centre Plaza Ballroom Entry Upgrades
  • Treasury Casino Entrance Refurbishment
  • Treasury Casino Data Centre
  • Level 7 Food and Beverage Outlets Suncorp Stadium
  • DFO Cairns

Aviation & Security

  • Ipswich Safe City Fitout Project
  • Brisbane Airport Construction Management of New International VIP Lounge and Bathroom Upgrade

Health

  • Lady Cilento Children’s Hospital Health Info Service
  • Royal Brisbane Womens Hospital Robotic Pharmacy
  • Maven Dental Practice Lutwyche
  • Queensland Health Levels 0 to 5 at 317 Edward St
  • Queensland Health FSS Amenities and Painting Blocks 1, 2, 4 / Coopers Plains

Base Building Upgrade

  • 259 Queen St End of Trip Facility
  • Level 15 / 15 Adelaide St
  • 232 Adelaide Street Rooftop
  • 30 Mary Street – PWD Bathroom
  • Qrail Refurbishment – Level 11
  • LTA 98 Thorn St Building Compliance Uprgrades

Optima Partitions

  • 25,000m2 Rio Tinto Workplace, Perth
  • 20,000m2 Origin Energy Workplace, Brisbane
  • 12,000m2 QUT Engineering Building Kelvin Grove, Brisbane
  • 7,500m2 Uni of Melbourne Bio21, Melbourne
  • 4700m2 Crime & Corruption Commission, Perth
  • 2400m2 UQ BEL Refurbishment Colin Clark Building, Brisbane
  • 2500m2 IAG Workspace Darling Park, Sydney
  • 550m2 Adelaide Day Surgery, Adelaide
  • 500m2 Sancta Sophia College, Sydney
  • 1200m2 Uni of Melbourne – SPOT Building FBE Teaching, Melbourne

Spoke Joinery

  • Abian Tower Residences
  • Wellspring
  • Williams Hall Chadwick
  • Meadowbrook Childcare Centre
  • Griffith Uni G14 Laser Print
  • DHS Bundaberg
  • Mt Tamborine SHS
  • Qantas Desks Domestic Terminal
  • Target Brookside
  • Kerry Australia
  • Clermont School

Special Projects – jobs that don’t fit the mould

Quadric has always prided itself on meeting the needs of best practices whilst streamlining the immediate 3project need for our customers; and from this ethic the Quadric Special Projects division was formed.

It is fitting that a division with an over 10 year history of meeting customer needs now get the opportunity to build upon these successes and take the idea to the next level.

Special projects specialise in cutting through the noise that can stand in the way of delivering particular types of projects, be it fast-tracked, limited design detail, works outside the box, or simply a customer that wants a more personalised service.

Often the starting point for their projects is the client has broad project objectives, but no clearly defined scope of works. The team then works with clients to develop the scope of works to meet all project objectives, including financial ones.

Since the Special Projects inception in March 2017, it has had some great successes for customers such as: – Investa

– Suncorp Stadium

– Department of Education

– Aria Property Group

– Qantas

and many more.

It just goes to show, it’s not what you build but how that it is important.

Do you have a project that doesn’t fit the traditional mould? Find out more about our Special Projects team, or contact Gavin Thorley – Manager Special Projects.