SELECTED PROJECT

Australian Tax Office

Date:
2013 - 2014
Duration:
40 Weeks
Location:
10 Banfield Street Chermside
Design:
Hassell
Size:
14,500m2
Value:
$14.5M
Industry:
CORPORATE
Team:

Project Director: Ben Scott
Project Manager: Anthony Ho
Contracts Administrator: Aiken Walker
Site Foreman: Neville Wareham

The recent completion of the ATO refurbishment has set a new benchmark for industry project excellence. As an accredited contractor with the Office of the Federal Safety Commissioner (FSC), Quadric delivered high level work quality, trades accuracy and integration, via HSEQ Best Practice throughout all aspects of project delivery.

The scope of the project required the completion of the base build upgrade, in conjunction with the large scale fitout covering a total area of 14,500m2. Such construction delivery required comprehensive project control and delivery methodology, a skilled in-house team and certified management systems to successfully complete the 6 individual stages of the project for timely handover to the client ATO.

The project success and delivery was credited to the partnership involving, Quadric, Westfield Design & Construction, DTZ Project Management, Hassell Architects, Interior Engineering, Turner & Townsend, ASK Consulting, and ATO.