SELECTED PROJECT

Kallangur SS Multipurpose Hall Reconstruction

Date:
2020-2021
Duration:
32 Weeks
Location:
Kallangur State School
Design:
Towill Design
Size:
3500m2
Value:
$3.5M
Industry:
EDUCATION
Team:

Project Manager: JP Kennedy
Contract Administrator: Will Pearce
Site Manager: Nathaniel Vearing, Mike Grundon, Scott Abell

Kallangur State Schools new ‘Mossman Hall’  was reconstructed by Quadric from the smaller footprint of their existing hall, doubling the area and capacity to use the multi-purposes.  A large interactive audio visual package was included along with a performance stage suitable for their specialist programs.  The works involved a CC3 certified steelwork structure allowing the facility to be used an emergency response site for the local community. Working with the existing school and site conditions, Quadric was able to deliver this major development for the school whilst continuing their school operations.    An administration refurbishment was also included which modernised their facilities.  A new transformer was installed to accommodate and future proof the campus for the next phase of  construction.   Quadric has already commenced the next phase of works which involves a resource centre extension, further increasing learning opportunities for students.

We thank Kallangur State School and Honeywill Consulting for your commitment to this project.